Transporting oversized industrial machinery requires careful planning, specialized equipment, and the ability to adapt to unexpected challenges.
Juno coordinated the transportation of a 112,000+ pound injection molding machine component from Busan, South Korea, to Ohio. Measuring 32'10" L × 11'2" W × 14'0" H, the injection unit required breakbulk ocean transportation, a specialized barge transfer, and heavy-haul trucking.
After arriving at the Port of New York, a low-clearance bridge prevented the planned overland route. Juno arranged a barge transfer to New Jersey to avoid the restriction. An additional challenge arose when the cargo was found to be two inches taller than originally reported. Juno coordinated crate modifications to reduce the overall height and allow the equipment to be properly secured to the trailer.
The final move required a nine-axle Removable Gooseneck (RGN) trailer, specialized routing, and coordination with routing and piloting specialists. The team also worked with the receiving team's riggers to provide measurements and handling information ahead of delivery. U.S. customs clearance was coordinated as part of the shipment.
Through alternative routing, specialized equipment, and hands-on coordination, Juno successfully delivered the injection unit to Ohio on August 18. From port transfers to final delivery, careful planning and flexibility were essential to overcoming the challenges of this shipment.